You can also see from the above two picures that the garage wall is half up and the coloumns at the front are almost complete. The pictures below show the new deck. The flooring on the deck, has also been laid.
We had a few days of rain but the boys managed to get lots done. At about 4.30am on a recent Friday morning they all got up and worked hard to pour this slab. They had to get up so early because the Concrete Pump truck driver had another commitment by 11am so they had to be all finished 10am. Below you can see that the sun has just come up and yet the guys had pretty much finished the pour. It was a great sight for me, getting up at 6am, in the dark and opening the door to see all the guys out there working hard. It was pretty cool. The truck was used to pump concrete from the concrete truck into the prepared area.
So today, I took some updated photos as we have come a fair way since the slab was poured. The garage walls are almost complete and the site has become even more interesting to passer bys. Anymore drivebys and we have to get traffic control for the area!
The windows have started to be bricked in.
I love letting Jada run down this corridor. We laugh so much.....til our tummies hurt!
Below is the garage, with a small selection of windows and doors waiting to be fitted.
The new walkway below has also been concreted. And the pond has also been been bricked up and poured.
After a long morning, and a game of tennis is the garage, its time to go in :)